click for site front page


ASOIF
Maison du Sport International
Av. de Rhodanie 54
1007 Lausanne
Switzerland
Phone: +41 (0)21 601 48 88
Fax: +41 (0)21 601 48 89
info@asoif.com

 
FEI - Fantastic Facilities in Hong Kong
25 Jun 2008 00:00
 

HKJC which will ensure that the Jumping Dressage and Eventing horses and riders compete in optimal conditions.

There is now a world-class laboratory, 5-star stabling, a first-class veterinary clinic, mobile horse-cooling units and green waste management. These are just some of the principle features of HKJC. These Games are breaking new ground in terms of attention to detail at every level Innovative and well-established ideas are combining to create a safe, clean and functional sporting environment in which those coveted Olympic medals can become the entire focus.

The HKJC has invested over HKD12 billion in creating venues and facilities for the 2008 Olympic and Paralympic equestrian events. Construction work has included the modification of the Hong Kong Sports Institute, which is located next to HKJC headquarters at Sha Tin Racecourse on the outskirts of the city, while at Penfold Park, in the very centre of Sha-Tin race-track, a training and competition area has been developed.

The Club has also provided facilities at the Hong Kong Golf Club and the Beas River Country Club for the cross-country phase of the Eventing discipline.

The main competition arena is located at Sha Tin and has a seating capacity of about 18000 with a supporting warm-up arena. A total of 13 ancillary training rings include two for general use, five for Dressage, four for both Dressage and Jumping, one specifically for Jumping only and an indoor air-conditioned ring. Penfold Park also embraces an 800m cross-country training track and schooling area, along with a 1200m all-weather bridle path and a turf gallop.

One of the most talked-about developments has been at the Olympic stable complex; construction started here in July 2006 and by May 2007 four blocks of air-conditioned stables totalling 225 stalls were completed and ready to accommodate 200 horses, while another 25 have been set aside for reserves. Each stall measures 36 x 36 meters which is bigger than normal Olympic standard and each unit measures 64 meters at its highest point. The barns are designed to maximise the benefits of the 24-hour air-conditioning system which will have a set temperature of 23 degrees Centigrade. Cool and hot air will be prevented from exiting or entering the stable blocks by the provision of an air curtain, while additional circulation will be provided by ceiling fans and the louvered ceiling windows and stall-windows can be opened in case of air-conditioning breakdown.

Each stable will have an automatic drinker and a revolving feed bowl and each block will have ice-making machines producing 250 lbs of ice per day - an important ingredient in the cooling of horses after exercise.

For the first time ever at an Olympic venue a rolling box measuring 205 square meters will be provided to allow horses the opportunity to relax stretch and play.

Security measures include 24-hour CCTV covering all areas and security sensors at entry to each stable which will trigger an alarm in the event of an after-hours break-in.

During site construction some 90 of trees at the Hong Kong Sports Institute were retained in their original positions while others were transplanted. At both the cross-country and core venues 500 new trees and some 17000 new shrubs were planted while fewer than 50 trees were felled mostly because they were diseased or dying.

The HKJC will make its Equine Hospital facilities and services available for emergency operations during the Olympic and Paralympic periods Its operating theatre anaesthetic and recovery rooms and clinical laboratory will be on call along with the 44-strong team.
A forge and shoeing bays are situated beside the veterinary facility


Main News
FEI - Launch for the NEW FEI Paralmypic Website and News Service
IAAF - IAAF celebrates 80 years of women athletics
ITF - Seeds announced for Paralympics
FIVB - Beach Volleyball Comes to Great Britain
FIG - Vera Sessina elected to Athletes Commission
FINA - All swimming doping tests were negative
FIVB - Dr Acosta hands over FIVB presidency to Mr Wei
Olympics 2008 - Daily Summary from ASOIF
Olympics 2008 - First outlook on viewing numbers
Olympics 2008 - Daily Summary from ASOIF
Olympics 2008 - Olympic Village update
Olympics 2008 - Daily Summary from ASOIF
2008 Olympics - Daily Summary from ASOIF
London 2012 - Venues confirmed
Olympics 2008 - Games running smoothly and competitions are under way
 
© 2008 ASOIF - Association of Summer Olympic International Federations. All Rights Reserved. powered by sportcentric